Draper SC1 Manual de instrucciones Pagina 77

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 120
  • Tabla de contenidos
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 76
Draper Digital Network
®
The Draper Digital Network which is run from the IP interface mentioned on the previous page is programmed through a series of actions.
These actions and items used to program the system are constantly changing so it is required to contact Draper before programming a Digital
Network. Here are the items that you will currently need to program a Draper Digital Network.
1 Laptop Computer
2 RS 485 adaptor cable- Draper can direct you where to buy.
3 DB9 to Cat 5 convertor- Draper can direct you where to buy.
4 Cat 5 patch cord at least 3’ long
5 ILT TAP- Buy from Draper
6 9V battery
7 GUI for programming- Draper will provide GUI
With these items, you will be able to obtain motor addresses and set group address to operate shades in the desired groups, up to 16
groups per motor.
The fi rst part of installing a Draper Digital Network is to obtain the address of each motor and note the address on a planning sheet or build-
ing fl oor plan. To obtain a motor address, you will need to do the following.
1 Power must be on to the shade.
2 You will need the GUI installed on your laptop.
3 You will connect the laptop to the low voltage line on the motor. This is done by connecting the RS 485 adaptor cable to the laptop, the
DB9 adaptor to the RS 485 cable, a Cat 5 cable from the DB9 to the ILT tap, and then you plug the motor into the ILT tap. A 9V battery or
transformer will need to be supplying power to the tap to work.
4 You will then bring up the motor GUI and hit the “GET ADDRESS” button to retrieve the motor address.
5 You will then need to mark down the address on a planning sheet or fl oor plan.
The next part of the install is the planning out of groups for operating the shades. You have the motor address, but you need to decide what
groups you want the motor to belong to by assigning like group addresses with different motors. If two motors have the same address in any
group, then they will run together when that address is told to go up or down. Steps to consider in grouping shades are:
1 Each motor address must be 6 characters long using numbers 0-9 and A-F.
2 You have 16 group addresses per motor.
3 Any two shades with the same address in them, whether it is a group 1 or group 5 or group16 address, will work together.
4 If using smart switches or virtual switches, you will want to program an individual address to each motor to make motor changes easier.
Page 77 of 120
Vista de pagina 76
1 2 ... 72 73 74 75 76 77 78 79 80 81 82 ... 119 120

Comentarios a estos manuales

Sin comentarios